Indoor Air Quality (IAQ) / Asbestos

January 4th, 2011

Indoor Air Quality

IAQ is perhaps the largest public health problem in the United States
workforce. As buildings age, problems occur undetected or detected
resulting in an environmental airborne hazard. On average we spend
over 90% of our time indoors. We are often exposed to fungal,
biological, and chemical elements which  can affect our health. ENI can
provide the necessary testing and sampling services to determine and
pinpoint exact contaminants.

Sampling and monitoring for these elements that affect your Indoor Air Quality is extremely benificial for your health and peace of mind. If a hazard is detected, ENI offers corrective solutions to immediately improve your environment.

These Include

  • Comprehensive Investigative Procedures to determine contaminants
  • Evaluation of Heating Ventilation Air Conditioning Systems (HVAC)
  • Electronic Documentation
  • HVAC Air Flow Control Balancing
  • Comprehensive Environmental Exposure Assessments.
  • Turnkey Environmental Remediation / Removal Services
  • Interim Control Methods and Procedures

Common Sampling

  • Carbon Dioxide
  • Hydrogen Sulfide
  • Temperature
  • Biological
  • Mercury Vapor Screening
  • Semi-Volatile / Volatile Organic Compounds (SVOC,VOC)
  • Water Sampling
  • Carbon Monoxide
  • Percent Relative Humidity (%RH)
  • Mold / Fungal
  • Chemical
  • PCB Evaluation

Asbestos Services Offered:

Project Management:

  • Asbestos Identification SurveysAsbestos valve pipe
  • Asbestos Project Design / Specification Development
  • Contract / Bid Administration
  • Contractor Pre-Qualification Evaluation
  • Contractor Bid Walk-Through Coordination
  • Bid Evaluation / Selection
  • Turnkey Abatement Services

On-Site Services

  • Asbestos Air Monitoring
  • Asbestos Waste Management
  • Asbestos Awareness Training
  • Asbestos Abatement Oversight
  • 6 month periodic Asbestos Surveillance
  • 3 year asbestos Re-Inspection
  • Asbestos Inspection / Management Plan Program Review
  • Operation and Maintenance Plan Program Review
  • PCB Removal / Project Design / Monitoring
    • K-12 School Systems (AHERA)
    • ASHARA
  • Asbestos Hazard Emergency Response Act of 1986

Comments are closed.